Golden Eagle Coil & Plastic Ltd

Download

Tel:
+86-799-6652759
+86-0769-83517380-806

Mobile:
eva dai  +86-18979985376
Vincene  +86-15818417261
Irene  +86-18273713863

QQ:
eva dai  2741947282
Vincene  2928711977
Irene  3094368671
Hi, how can I help you? eva dai

Skype:
Eva dai
Vincene

 Your Location :  Home > 资料下载Preparation Prior to Mass-production Control Procedure

点击下面的图标下载这个文件

简单介绍

标题/Title:量产前准备管制程序/ Preparation Prior to Mass-production Control Procedure 
  After samples are complete, PE inspects according to customer requirement and records the data. Sends  
   the drawing、inspection specification etc to QA for inspection .At the same time, records sample  
   data in「Sample process track Sheet」,and prepare relevant documents prior for mass production.  
5.3.5 品保部接到样品后, 按工程提供的检验标准进行抽样检测, 并将结果记录在「样品规格承认书」中.
  QA department inspects according to inspection requirement which PE department provids. The result  
   shall be recorded in「Specification for Approval」sheet.        
5.3.6 样品经品保检测合格后,附检测记录交工程部,工程部给予包装后交业务,视情况附[样品规格承认书]
  (包含QA的检测报告、图面等)交给业务;若QA检测不符合要求,则退回工程部,由工程部主管决定处
  理方式。              
  After QA inspection, PE department shall pack samples together with FA report and pass to Sales,   
  If QA found samples not conforming to requirement, samples will be returned to PE department.  
  The PE supervisor shall make decision on non-conform samples.      
5.4  送样品给客户/Sending sample to customer           
5.4.1 业务接到样品及相关资料后,按客户要求的时间、地点寄交客户,并登记在[送样记录]中  
  Sales receives sample and relevant data from PE department, they will mail to customer according to the given
  address and specified time and registers in [Sample Tracking  Record ].       
5.4.2 样品送出后,业务通知客户或相关部门;并追踪客户对样品的确认结果,并告知相关部门  
   After samples are mailed, Sales will notify customer or related department;   
     follow up with customer on verification result and make known to other departments.      
5.5 客户下单/Customer order:            
5.5.1 客户下单后,业务应做相应的审查并与客户沟通,详细参照[合约审查管制程序]。  
  Once customer places an order, Sales shall review relevant document and communicate with customer. For       
   further details please refer to [ Contract Review Control Procedure ] .      
5.5.2 业务接到客户的订单后,如果三个月未生产和新产品,需发出生产前的准备通知,  
  第一时间通知工程、生产等相关单位。          
  After receiving customer's order, Sales issues preparation notification for pre-mass production, and notify  PE 、
  MF and other related departments.          
5.6 生产前准备/Pre-mass production preparation:        
5.6.1 工程部/PE department:            
a. 根据制作样品时的相关状况或过程,制定该产品所需的BOM(物料清单)、PMP(制程管制计划)、WI
  (工作指示)等文件。等资料制作完成后,工程部召集相关部门负责人开产前会议,介绍产品的生产流程
  、所需的机器设备、仪器的型号及相关事项的说明,并记录于「产前确认记录表」中。特殊情况下(如
  时间紧急),由业务召集相关部门开会讨论。        
  Based on the sample making process, work out  BOM (Bill Of Material)、PMP (Process Management Plan)
  and  WI  (Work Instruction) etc.which is now needed for mass-production.     
  After all documents are done, PE calls for press-mass production meeting with related department personnels on